Financial Reports

Filter by Year:2021 2020 2019 2018 2017 
30-Apr-2021

HIGHLIGHTS:

Bryah Basin Copper-Gold Project (100%)

  • Major drilling campaign (18,000 metres) commenced
  • Phase 1 RC drilling program (8 holes for 1,925m) at significant VMS copper-gold target at Windalah completed and assays pending
  • Down Hole Electromagnetic Survey of 5 RC drill holes underway

Bryah Basin Manganese Joint Venture (60% JV Interest)

  • Diamond drilling completed (7 holes for 201m)
  • Scanning of diamond drill core using XRF technology completed ahead of beneficiation testwork and mineral resource estimate
  • OM (Manganese) Limited funded project expenditure to increase JV Interest to 40%

Gabanintha Project (100%)

  • Bonanza results recorded in gold assaying of samples from previous drilling. Best gold intercept:
  • 19RRC006 - 10m @ 27.5 g/t Au from 53m, including 4m @ 64.3 g/t Au
      &n
  • 1