Financial Reports

Filter by Year:2021 2020 2019 2018 2017 
29-Oct-2021

HIGHLIGHTS:

Bryah Basin Copper-Gold Project (100%)

  • Diamond drilling program confirms a significant Volcanogenic Massive Sulphide (VMS) system with copper-gold potential at Windalah Prospect
  • Initial logging of drill core has identified styles of mineralisation typical of VMS deposits
  • Down Hole Electromagnetic Survey at Windalah about to commence, completion in November 2021
  • Aircore drilling program at Mount Labouchere Prospect returns anomalous Copper-Cobalt-Nickel results

Bryah Basin Manganese Joint Venture (60% JV Interest)

  • RC drilling program (69 holes for 2,271 metres) completed – assays pending
  • Beneficiation testwork and mineral resource estimates ongoing
  • OM (Manganese) Limited funding exploration to earn a 51% JV Interest

Gabanintha Project (100%)

  • Aircore drill program (113 holes for
27-Jul-2021

HIGHLIGHTS:

Bryah Basin Copper-Gold Project (100%)

  • Phase 1 RC drilling program at the Windalah Copper-Gold Prospect intersects broad sulphide-rich zone with highly elevated VMS pathfinder minerals
  • Highest copper results: – 2m @ 0.23% Cu from 132m in BBRC063, and 4m @ 0.12% Cu from 136m in BBRC064
  • DHEM and DDIP surveys at Windalah identify coincident geophysical anomalies
  • Aircore drilling program completed with 31 holes for 2,537 metres at Windalah and 6 holes for 279 metres at Mount Labouchere Prospects – assays pending
  • Phase 2 (diamond core) drilling to test depth extensions at Windalah Prospect to commence in August

Bryah Basin Manganese Joint Venture (60% JV Interest)

  • Geological mapping and Gradient Array IP (GAIP) surveys completed at Brumby Creek – several targets identified for drill testing
  • Scanning of diamond drill core using XRF
30-Apr-2021

HIGHLIGHTS:

Bryah Basin Copper-Gold Project (100%)

  • Major drilling campaign (18,000 metres) commenced
  • Phase 1 RC drilling program (8 holes for 1,925m) at significant VMS copper-gold target at Windalah completed and assays pending
  • Down Hole Electromagnetic Survey of 5 RC drill holes underway

Bryah Basin Manganese Joint Venture (60% JV Interest)

  • Diamond drilling completed (7 holes for 201m)
  • Scanning of diamond drill core using XRF technology completed ahead of beneficiation testwork and mineral resource estimate
  • OM (Manganese) Limited funded project expenditure to increase JV Interest to 40%

Gabanintha Project (100%)

  • Bonanza results recorded in gold assaying of samples from previous drilling. Best gold intercept:
  • 19RRC006 - 10m @ 27.5 g/t Au from 53m, including 4m @ 64.3 g/t Au
      
  • 1