ASX Announcements

Filter by Year:2021 2020 2019 2018 2017 
14-May-2021
14-May-2021
14-May-2021
14-May-2021
6-May-2021

Analysis of diamond holes confirms significant high-grade manganese

Highlights:

  • Full drill core scanned using high-resolution non-destructive XRF analysis
  • Scanning results confirm the presence of shallow high-grade manganese with grades exceeding 50% Mn over 10cm intervals recorded
  • Variability in manganese grades indicate that beneficiation should be achieved
  • Core samples to be used in upcoming beneficiation testwork program ahead of Mineral Resource Estimates
  • All activities are fully funded by Joint Venture partner OM (Manganese) Limited
30-Apr-2021

Highlights:

Bryah Basin Copper-Gold Project (100%)

  • Major drilling campaign (18,000 metres) commenced
  • Phase 1 RC drilling program (8 holes for 1,925m) at significant VMS copper-gold target at Windalah completed and assays pending
  • Down Hole Electromagnetic Survey of 5 RC drill holes underway

Bryah Basin Manganese Joint Venture (60% JV Interest)

  • Diamond drilling completed (7 holes for 201m)
  • Scanning of diamond drill core using XRF technology completed ahead of beneficiation testwork and mineral resource estimate
  • OM (Manganese) Limited funded project expenditure to increase JV Interest to 40%

Gabanintha Project (100%)

  • Bonanza results recorded in gold assaying of samples from previous drilling. Best gold intercept:
  • 19RRC006 - 10m @ 27.5 g/t Au from 53m, including 4m @ 64.3 g/t Au
      &n
21-Apr-2021
9-Apr-2021

Drilling at Windalah VMS copper-gold prospect in the Bryah Basin

Highlights:

  • 8,000 metre multi-phase reverse circulation/diamond drilling program planned
  • First phase (2,000m) of RC/diamond drilling commenced today
  • Program designed to test significant Volcanogenic Massive Sulphide (VMS) copper-gold target at Windalah prospect
7-Apr-2021

18,000 metres of drilling to test Windalah VMS copper-gold prospect and several other high-priority targets in the Bryah Basin

Highlights:

  • 8,000 metre multi-phase reverse circulation/diamond drilling program planned
  • First phase of RC drilling to begin in coming days
  • Program designed to test significant Volcanogenic Massive Sulphide (VMS) copper-gold target at Windalah prospect
  • 10,000 metre Aircore drilling program targeting copper-gold across several locations planned.